Gabon has the highest grade of manganese ore and one of the largest reserves in the world. Its exports of the ore rose more than fivefold in ten years. Almost all of it leaves unprocessed, because the power and the transport that processing needs cost more here than elsewhere.
What the work found
Three companies, 4,383 jobs
Six jobs in ten are in extraction, one in processing and three in logistics.
A small plant at the mine
What is processed becomes about 20,000 tonnes of manganese metal and 65,000 tonnes of alloy.
Power costs too much
Industrial power can cost as little as 27 CFA francs a unit in Europe. In Gabon it costs 110 from the dams and 250 from diesel generators, and the dams are poorly connected to the port area.
The mines are far from the sea
The ore travels hundreds of kilometres on one railway. Rail costs about 30% more than in a neighbouring country, and exporting costs up to 30% more than elsewhere in Central Africa.
Prices swing
Exports fell in each downturn, and the price has dropped by as much as 60%.
What alloy would add
The study estimates 47 jobs for every 10,000 tonnes of alloy exported, and a rise in value from US$1.1 billion to about US$11 billion.
What it calls for
- Power near the portGas-fired generation where hydropower does not reach, and a connected grid.
- More trackDouble the line out of the capital and finish the upgrade of the railway.
- Process in a clusterAn industrial cluster in the mining region, with the newer mines moving into processing first.
- Use the by-productSlag from processing can supply a cement industry.
One of the value-chain studies behind the partnership strategies our team led.